Server & storage

Server installation and storage systems in Chandigarh

We size the box to the workload, supply it, rack it and migrate your data over a weekend so Monday morning looks the same to your staff. Vendor-agnostic, so the recommendation follows the requirement rather than a quota.

Server & storage work of the kind Hash delivers across the Tricity

What you get

The outcome you are buying

01

Right-sized on day one

We measure your current load before quoting, so you buy the RAM and IOPS you will actually use in three years rather than a reseller's default configuration.

02

Migration outside working hours

File shares, ERP databases and mail move over a weekend window with a tested rollback, so no working day is lost to the cutover.

03

One vendor to call afterwards

Hardware, hypervisor and storage come from us as one platform, so a failed disk is our problem to chase with the OEM rather than yours.

04

Capacity you can see

Storage and backup dashboards handed over at go-live, so you know how much room is left before it becomes a Friday evening emergency.

Included

What sits under this service

Each line is something we supply, configure and support, not a category heading.

Tower and rack servers
Sized for file, ERP, Tally, domain controller and application workloads.
Hyper-converged infrastructure (HCI)
Compute, storage and networking in one cluster where rack space and cooling are tight.
High-performance computing (HPC)
Multi-node clusters for engineering simulation and research workloads.
SAN and NAS storage
Shared block and file storage with the RAID level chosen for the rebuild window, not the brochure.
DAS and expansion shelves
Direct-attached capacity added to an existing server without a full replacement.
Cloud and on-demand storage
Off-site tiers for archives and second backup copies, billed on what you use.

How it runs

Survey to handover

The sequence we follow, so you know what happens and when.

  1. 01

    Load assessment

    We read your current CPU, memory and disk figures over a working week rather than asking you to estimate them.

  2. 02

    Sizing and quotation

    You get a configuration with the reasoning attached, and the option we ruled out with the reason why.

  3. 03

    Staging

    The server is built, firmware-updated and tested at our Sector 40-C office before it reaches your rack.

  4. 04

    Weekend cutover

    Data moves in a planned window with the old system left intact and bootable until you sign off.

  5. 05

    Handover

    Admin credentials, warranty records, IP schedule and a one-page runbook go to your named IT contact.

Questions we get asked

Server & storage: straight answers

How long does a server migration take?

A single-server migration is normally a Friday-night-to-Sunday window. The data copy runs first and the switchover happens last, so the old server stays bootable until you confirm the new one is behaving.

Should we buy a server or move to the cloud?

Buy the server when your workload is steady, your data is large and your internet link is your weak point — which describes most Tricity factories and schools. Move to cloud when demand is spiky or you have no room to host equipment safely. We quote both and show the three-year cost of each.

Do you supply a specific server brand?

We are vendor-agnostic and bundle hardware, software and services into one platform, so the brand follows the workload and the warranty terms you need. {{TBC: which server OEMs is Hash formally authorised to sell and support?}}

What happens if a disk fails after installation?

You call the helpline and we handle the OEM warranty claim. RAID is configured so a single disk failure does not stop work, and AMC clients get the replacement chased as part of the contract.

Who we do this for

Sectors where this comes up most

All sectors